Chapter 301. Preparation for Specified Skilled Worker Acceptance Plan in the construction field Application
05. Document No.2 Construction Business License

【overview】
These are the documents required for online application.

システム項目:12

Check if the expiration date is within the period

At the time of application for acceptance plan certification, expired plans will not be accepted.
There is no specification of the remaining period as of the application date.

The deadline for renewal procedures is between 90 days and 30 days before the expiration date.

Specified Skilled Worker You don't need to match the work you want to work in with the licensed industry you have obtained
If the work is included in the business category under the Specified Skilled Worker status of residence, the company can engage in any type of work permitted by the Construction Business Act.
<If you are currently applying for renewal permission> Attach a copy of the old license and renewal permission application form.
The copy of the renewal permit application form must be on the front page, and must have the approval stamp of the permitting authority.
<If you are currently applying for renewal permission> As soon as we receive the new license during the application process, we will apply for a replacement.
[Caution] <If your renewal application is rejected> Even if your certification has already been granted, it will be cancelled.

Home

  • がいこくじんをうけいれるかいしゃ 特定技能外国人受入企業さま
  • しごと/はたらくひとをさがす 無料 求人求職情報
  • しけんをうけたいひと/うけたひと 特定技能1号評価試験 詳しい情報・申込み
  • にっぽんではたらきたいひと 日本で働きたい人
  • JACマガジン

Home

  • がいこくじんをうけいれるかいしゃ 特定技能外国人受入企業さま
  • しごと/はたらくひとをさがす 無料 求人求職情報
  • しけんをうけたいひと/うけたひと 特定技能1号評価試験 詳しい情報・申込み
  • にっぽんではたらきたいひと 日本で働きたい人
  • JACマガジン